The size of hangar in airport is guided by
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
Traffic capacity is the
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
Travel time and delay studies on a preselected section of a highway are conducted by
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
Which one of the following methods is most commonly used to measure the thickness of asphalt in road construction?
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
Which one of the following traffic survey schemes is most relevant when deciding on locating major routes in a city?
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
While driving at a speed of \(30\) kmph (with available friction \(0.4\)) down the grade, the driver requires a braking distance twice that required for stopping the vehicle when he travels up the same grade. The grade is
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
A \(3\%\) downgrade curve is followed by a \(1\%\) upgrade curve and the rate of change of grade adopted is \(0.1\%\) per \(20\) m length. The length of the respective vertical curve is
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
A vehicle was stopped in two seconds by fully jamming the brakes. The skid mark measured \(9.8\) metres. The average skid resistance coefficient will be
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
For water bound macadam roads in places of heavy rainfall, the recommended value of camber is ____
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
The ruling design speed on a National Highway in plain terrain as per IRC recommendations is ____
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
The maximum ruling gradient in a rolling terrain according to IRC can be
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering
During CBR test, the load sustained by a re-moulded soil specimen at \(5\,\mathrm{mm}\) penetration is \(50\,\mathrm{kg}\). The CBR value of the soil will be
TS PGECET - 2026
TS PGECET
Civil Engineering
Highway Engineering