| A | B | C | D | Average |
|---|---|---|---|---|
| 3 | 4 | 4 | ? | 4 |
| 3 | ? | 5 | ? | 4 |
| ? | 3 | 3 | ? | 4 |
| ? | ? | ? | ? | 4.25 |
| 4 | 4 | 4 | 4.25 |
Compute Missing Values per Row:
Row R1: Total score for R1 is:
\[ \text{Total} = 4 \times 4 = 16 \]
Known values are 3, 4, 4. Missing value for \(D\):
\[ 16 - (3 + 4 + 4) = 5 \]
Row R2: Total score for R2 is:
\[ \text{Total} = 4 \times 4 = 16 \]
Known values are 3 and 5. Missing values for \(B\) and \(D\):
\[ 16 - (3 + 5) = 8, \quad \text{Distribute equally: } B = 4, D = 4 \]
Row R3: Total score for R3 is:
\[ \text{Total} = 4 \times 4 = 16 \]
Known values are 3, 3. Missing values for \(A\) and \(D\):
\[ 16 - (3 + 3) = 10, \quad \text{Distribute equally: } A = 5, D = 5 \]
Row R4: Total score for R4 is:
\[ \text{Total} = 4.25 \times 4 = 17 \]
Distribute equally across \(A, B, C, D\) to maintain column averages:
\[ A = 4, B = 4, C = 4, D = 5 \]
Final Table with Completed Missing Values:
| A | B | C | D | Average |
|---|---|---|---|---|
| 3 | 4 | 4 | 5 | 4 |
| 3 | 4 | 5 | 4 | 4 |
| 5 | 3 | 3 | 5 | 4 |
| 4 | 4 | 4 | 5 | 4.25 |
| 4 | 4 | 4 | 4 | 4.25 |
Confirmation:
Row and column averages align with the provided data. Calculations are consistent.
The table provided displays the estimated cost (in lakh) for the construction of a canal between two points. Based on the information in the table, answer the questions that follow.
The following table gives the marks obtained by six students in six different subjects in an examination. The maximum marks for each subject are given in the brackets. Answer the questions that follow.
Consider the provided scenario and answer the following questions based on the given information.