The instruments required for contour survey are: (A) dumpy level, (B) levelling staff, (C) chains and tapes, (D) odometer, (E) prismatic compass. Choose the correct answer from the options given below:
Show Hint
Every contouring method requires vertical control (measured using a level and staff) and horizontal control (measured using chains, tapes, or tacheometers) to map the elevation points accurately.