Question:easy

The instruments required for contour survey are: (A) dumpy level, (B) levelling staff, (C) chains and tapes, (D) odometer, (E) prismatic compass. Choose the correct answer from the options given below:

Show Hint

Every contouring method requires vertical control (measured using a level and staff) and horizontal control (measured using chains, tapes, or tacheometers) to map the elevation points accurately.
  • (B), (C) and (D) only
  • (C), (D) and (E) only
  • (A), (B) and (C) only
  • (A), (C) and (D) only
Show Solution

The Correct Option is C

Solution and Explanation