Question:
medium
Lerchs--Grossmann algorithm or nested pit shells are most commonly used for which stage of mine planning?
Show Hint
Remember: \[ \boxed{ \text{Lerchs--Grossmann} \Longrightarrow \text{Ultimate Pit Limit Optimisation}. } \]
TS PGECET - 2026
TS PGECET
Updated On:
Jul 14, 2026
Short-term production scheduling
Ultimate pit limit optimisation (economic pit shell determination)
Equipment selection
Ventilation network design
Show Solution
The Correct Option is
B
Solution and Explanation
Download Solution in PDF
Was this answer helpful?
0
Top Questions on Mine planning and its components
The average grade of the mineral of a vein type of orebody with grade and thickness varying from place to place within the same orebody is arrived by
TS PGECET - 2026
Mining Engineering
Mine planning and its components
View Solution
In work-study (time and motion study) applied to mining operations, what is the primary purpose of a “rating factor”?
TS PGECET - 2026
Mining Engineering
Mine planning and its components
View Solution
Which reserve estimation technique assumes a completely random distribution and is generally used only for initial rough estimates?
TS PGECET - 2026
Mining Engineering
Mine planning and its components
View Solution
According to the UNFC (United Nations Framework Classification) system, which category represents the highest level of geological confidence and economic viability for a mineral deposit?
TS PGECET - 2026
Mining Engineering
Mine planning and its components
View Solution
Want to practice more? Try solving extra ecology questions today
View All Questions
Questions Asked in TS PGECET exam
For a van der Waals gas, the internal energy U
TS PGECET - 2026
Metallurgical Thermodynamics
View Solution
Match the following:
List-I (Boring Methods)
List-II (Field Conditions)
(A)
Auger Boring
(I)
Below water table in all soil types except hard soils and rocks
(B)
Wash Boring
(II)
Large diameter bore holes over 150 mm in size
(C)
Percussion Drilling
(III)
Exploration for shallow foundations and highways
(D)
Rotary Drilling
(IV)
Bouldery and gravelly strata
The correct answer is:
TS PGECET - 2026
Foundation Engineering
View Solution
Which guideline integrates GMP, GLP and GCP principles globally?
TS PGECET - 2026
Forensic Pharmacy
View Solution
Let \(A\) and \(B\) be \(n\times n\) real matrices. Which of the following statements is correct?
TS PGECET - 2026
Matrix
View Solution
Match the following:
List-I
List-II
(A)
Slope Deflection Method
(I)
Force Method
(B)
Moment Distribution Method
(II)
Displacement Method
(C)
Method of Three Moments
(D)
Castigliano's Second Theorem
The correct answer is:
TS PGECET - 2026
Structural Analysis
View Solution