Question:medium

Arrange the sugarcane ratoon management practices in proper sequence - (A) Emerged shoots cut at ground level.
(B) Sides of ridges are broken by plough.
(C) First irrigation is given 3 to 4 weeks after harvesting.
(D) Nutrients are given and an earthing up operation should be done.
Choose the correct answer from the options given below:

Show Hint

Ratoon management is critical for higher yield. Immediate care after harvest ensures healthy regrowth and better productivity.
Updated On: Jan 16, 2026
  • (A), (B), (C), (D)
  • (A), (D), (C), (B)
  • (B), (A), (D), (C)
  • (C), (B), (D), (A)
Show Solution

The Correct Option is A

Solution and Explanation

Step 1: Ratoon Crop Management Review.
Sugarcane ratoon management refers to post-main crop harvest practices aimed at promoting robust regrowth.

Step 2: Sequence of Actions.
1. Cut emerged shoots at ground level (A) → To eliminate non-productive shoots and foster uniform tillering. 2. Break the sides of ridges with a plough (B) → This facilitates aeration and improves soil contact for emerging shoots. 3. Apply first irrigation after 3–4 weeks (C) → Essential for proper sprouting and development of the ratoon crop. 4. Apply nutrients and perform earthing up (D) → Provides necessary nutrients and anchors the crop.

Step 3: Determination.
Therefore, the correct order of operations is (A), (B), (C), (D).

Final Answer: \[\boxed{\text{Correct sequence = (A), (B), (C), (D).}}\]