A mould cavity of $1200\text{ cm}^3$ volume has to be filled through a sprue of $10\text{ cm}$ length feeding a horizontal runner. Cross-sectional area at the base of the sprue is $2\text{ cm}^2$. Consider acceleration due to gravity as $9.81\text{ m/s}^2$. Neglecting frictional losses due to molten metal flow, the time taken to fill the mould cavity is}