Given below are two statements
Statement I: Free board is the additional height of the dam provided as a safety factor to prevent overtopping due to unexpected runoff or by wave action.
Statement II: Free board is the vertical distance between the designed water elevation and the elevation of the top of the dam before settlement.
In light of the above statements, choose the most appropriate answer from the options given below