Bench terraces are planned on \(15\%\) hill slope. The vertical interval is \(2.5\) m, and the riser has a slope of \(1:1\). The earthwork in cutting is equal to the earthwork in filling. The volume of earthwork per hectare (in m\(^3\)/ha) is ________ (Rounded off to the nearest integer)